Orion Point Retirement Village, Auckland
JFC developed a 5.5 hectare site for the Orion Point Retirement Village in Hobsonville Point, Auckland.
LocationHobsonville Point, Auckland
CategoryLand Development
ClientMetlifecare


The scope of works consisted of the following:
- Stripping vegetation and demolishing structures
- Removal of 2000t of asbestos contaminated material
- Stripping 14,000m3 topsoil to stockpile, cut 30,000m3 clay to stockpile and 40,000m3 to waste, cut 10,000m3 fill, and lime stabilising soft spots
- Construction of new wastewater pump station, a combination of rising main and gravity main
- Utility network installation, including power, communications, gas, water, storm and waste
- Construction of a shared path and boardwalk along the wetland, plus associated planting
- Construction of public and private carriageways, footpaths and associated amenities including street lighting
- Providing vertical contractors with early occupation, managing interface of site access and staging adjustments to accommodate tie-in works, to ensure best project outcome for the client