The scope of works consisted of the following:
Stripping vegetation and demolishing structures
Removal of 2000t of asbestos contaminated material
Stripping 14,000m3 topsoil to stockpile, cut 30,000m3 clay to stockpile and 40,000m3 to waste, cut 10,000m3 fill, and lime stabilising soft spots
Construction of new wastewater pump station, a combination of rising main and gravity main
Utility network installation, including power, communications, gas, water, storm and waste
Construction of a shared path and boardwalk along the wetland, plus associated planting
Construction of public and private carriageways, footpaths and associated amenities including street lighting
Providing vertical contractors with early occupation, managing interface of site access and staging adjustments to accommodate tie-in works, to ensure best project outcome for the client